1. Survey the site and how it will be used

Estimate how many vehicles will charge and when, then choose the right mix of AC chargers for long stays and DC fast chargers for quick top-ups.

2. Check the electrical supply

Confirm the transformer, meter and main board can take the load. If not, apply to the utility for more capacity early.

3. Plan bays and traffic flow

Place chargers, cable runs, surfacing, signs and bay markings so drivers can charge conveniently and safely.

4. Paperwork and permits

Prepare the drawings and documents for the relevant authorities so the station can open on schedule.

5. Maintenance and expansion

Lay spare conduits for future chargers and schedule regular equipment checks.